- Factory pricing, with one intermediary in the chain: us
- Anything from one 835 kWh block to multi-GWh pipelines
- LFP systems your lenders already know (BloombergNEF Tier 1)
- A first reply within 48 hours
mellon.energy works with CORNEX, CUBENERGY and Hoymiles. We help you pick the right system, get the documents your lenders want, and keep things moving between you and the factory until the system is running.
Or call us: +49 89 24414745-0

Most conversations start with one of these four teams. Each needs something different from us, so here is what that looks like in practice.
The short version: if you want a complete system that connects straight to the grid, look at CUBENERGY. If you want DC containers and a medium-voltage station from one supplier, look at Hoymiles. If your team integrates its own PCS, CORNEX gives you the most freedom. Not sure yet? That is what the first call is for.
CUBENERGY builds complete AC systems: battery, PCS, BMS and grid interface in one unit, using CORNEX LFP cells. The PowerCombo-E5 puts 5 MWh in a 20 ft container. The FlexCombo 2.0 scales from 835 kWh to 16 MWh per block. CUBENERGY has installed 3,580 MWh across more than 220 projects in Europe.
Hoymiles pairs its HoyDC 5MWh DC container with the HIM5175MV station, which puts the PCS, transformer and switchgear on one skid. You get a direct 10–35 kV grid connection without sourcing the MV side separately. Rated for 8,000+ cycles, IP55, certified to UL9540A and IEC 62619.
CORNEX makes the cells inside both its own containers and CUBENERGY’s. The M5 (5 MWh) and M6 (6.25 MWh) DC containers suit EPCs who want to choose and integrate their own PCS. CORNEX was one of the five largest storage battery suppliers worldwide in 2025 and delivered more than 90 GWh that year.
These are our manufacturers’ projects, not ours. We think that is the more useful thing to show you: real sites and real sizes, in grids like yours.
220+ European projects · 2,475 MW / 3,580 MWh installed (CUBENERGY, Dec 2025) · 90+ GWh delivered globally (CORNEX, 2025)
Selected Projects
Four steps. The last one takes the longest, and it is where we are most useful.
Size in MW and MWh, location, use case and timing. Rough numbers are fine. You will hear back within 48 hours.
We work out which of the three manufacturers fits and put together a technical and commercial offer. If none of them is right for your project, we will say so.
Certificates, cell test data and warranty terms, in the form your lenders and investors expect.
Between contract and go-live there is factory scheduling, shipping to Europe, site logistics and commissioning. We sit between you and the factory the whole way, in your time zone and your language.
Fair question. You could call the factories yourself. Here is what we add.
We work directly with CORNEX, CUBENERGY and Hoymiles. When you need a firm answer on a delivery date or a spec, we know who to ask, and we usually get it faster than a cold email would.
Our team in Munich has spent more than 25 years working with Chinese companies. We know how decisions get made there, what gets lost in translation, and how to keep a project on track across two very different ways of working.
Certificates, bankability files and technical documentation, prepared up front rather than after your lender asks for them.
The new AC block platform covers utility and C&I projects, with cloud BMS and plug-and-play installation.
Read more →Founded by Dai Deming in 2021, CORNEX reached the global top five for storage shipments in the first half of 2025. It ranks second for effective production capacity.
Read more →The large-format LFP cell reaches 190 Wh/kg and 419 Wh/L, which means more storage in the same container footprint.
Read more →Battery grade 99.5% Li₂CO₃ · CNY / tonne · GFEX futures
Why we show this
Lithium carbonate is one of the biggest inputs into what a battery system costs. When it moves, quotes follow. We keep an eye on it so we can tell you whether now is a good moment to lock in a price.
Current price and recent trend per Trading Economics (two-year high of 200,500 CNY/t on May 13, 2026); earlier 2025 trend estimated from InfoLink Consulting / SMM data. Daily values interpolated between confirmed anchor points. For market context only — not investment advice.
Sources: Trading Economics · InfoLink / SMM
Even if it is early and the numbers are rough. A first conversation costs nothing and does not commit you to anything.
We don’t share your project details without your OK.
Size, location, use case, timing. We will reply within 48 hours.